Mark out and install all brackets onto tile at ???mm from the finished floor.
Drill out holes with the diamond grinder tile bits. These don't typically last very long so if you need to order more please click on this link.
Hang all medicine cabinets and all vanity boxes.
Install all gables either before you hang the cabinets or after depending on the situation.
Doing an initial balance will save lots of time later on and stop any damage from happening from misaligned doors or drawers from hitting or rubbing.
Make sure to install both parts of the hinge covers. This will stop hinge covers from being missed and getting lost.
This will again stop covers from being missed by labourers or being lost all together.
This should be installed on the inside of the sink cabinet near the back and the top. This way the sticker will not be visible after everything else has been installed but we are still able to view it later on if needed.
You should put your name, the date, and any issues or comments about the vanity or its install.
Take away any garbage/boxes/wrapping that you have accumulated and make sure it goes into a garbage bin or box to be removed later.
Tidy and sweep up your area to make sure that no sawdust has been left.